Process & Project Management · Q8 of 10

What's your approach to risk identification and mitigation in projects?

Why This Is Asked

Interviewers want to see that you think ahead about what could go wrong. They're looking for proactive identification of technical, schedule, and dependency risks—and concrete mitigation or contingency plans.

Key Points to Cover

  • When and how you identify risks (kickoff, planning, ongoing)
  • Categorizing and prioritizing risks (likelihood × impact)
  • Mitigation vs. contingency strategies
  • Making risks visible to stakeholders

STAR Method Answer Template

S
Situation

Describe the context - what was happening, what team/company, what was at stake

T
Task

What was your specific responsibility or challenge?

A
Action

What specific steps did you take? Be detailed about YOUR actions

R
Result

What was the outcome? Use metrics where possible. What did you learn?

💡 Tips

  • Use an example where you identified a risk early and mitigated it—or where one materialized and you responded
  • Show you don't just list risks; you take action on them

✍️ Example Response

STAR format

Situation: At a fintech startup, we were building a new KYC (Know Your Customer) integration with a third-party provider. The project had a hard deadline—regulatory requirement. I led the technical effort. During kickoff, I ran a risk assessment and identified several concerns: the vendor's API had limited documentation, we had no fallback if they had an outage, and our team had no prior experience with their system.

Task: I needed to identify risks proactively, prioritize them, and put mitigation and contingency plans in place.

Action: I created a risk register with likelihood, impact, and mitigation for each item. For the API documentation gap, I scheduled a technical kickoff with the vendor and documented the integration flow—we discovered several edge cases we'd have missed. For the vendor outage risk, I designed a graceful degradation path: we'd queue requests and retry, and we'd show users a clear status. For the team's lack of experience, I arranged for a 2-day workshop with the vendor and built a small proof-of-concept before the main build. I shared the risk register with leadership and set up biweekly risk reviews. When the vendor had a 4-hour outage during our UAT, our queue-and-retry design meant we had zero data loss.

Result: We shipped on time and passed the regulatory audit. The outage would have been critical without our contingency. I learned that risk identification isn't a one-time exercise—it needs to be ongoing, and mitigation plans need to be real, not just documented.

🏢 Companies Known to Ask This

Company Variation / Focus
Amazon Dive Deep, Deliver Results — "How do you identify and mitigate risks?"
Google Structuring unclear situations
Meta Scale, execution
Microsoft Execution under pressure
Stripe Building reliable systems
Uber Results orientation

Cookie Preferences

Strictly Necessary
Required for the site to function. Cannot be disabled. Includes auth sessions and security tokens.
Always on
Analytics
Helps us understand how visitors use the site (page views, interactions). No personal data is sold.
Marketing
Used to show relevant ads and track campaign performance. Currently not used on this site.